A documented load test verifying that lifting or pulling equipment (wireline, slickline, crane rigging) holds rated capacity. The pull-test sheet is standard job-packet backup.
Why it matters before the job moves
A missing pull-test sheet is a classic invoice blocker — the work was done, but the proof wasn't captured.
Stop renting software. Own your operation.We build custom operating systems for oilfield service companies — deployed on your cloud, owned by you. It starts with an Operations Audit.